EQUIPPED TO HANDLE PROJECTS OF ANY SIZE
EQUIPPED TO HANDLE
PROJECTS OF ANY SIZE
LOCATION
Bangalow
CLIENT NAME
Lend Lease
ONGOING SINCE
2013 - 2015
Pacific Highway Upgrade
BACKGROUND INFORMATION
Arrow Concrete Cutting services were employed for major roadworks on tunnel construction for the important St Helena Tunnel. Part of the major Tintenbar to Ewingsdale Pacific Highway Upgrade, the St Helena tunnel is located in Ballina.
Excavated by drill and blast, the tunnel features twin parallel tubes 434 metres in length, as well as cross passages and a control room on top of St Helena.
The Challenge
Tintenbar to Ewingsdale Pacific Highway upgrade covered the major roadworks for the St Helena tunnel upgrade.
The tunnel required installation of signage, pavement and bridge cutting in among the other planned maintenance works.
The Solution
Arrow Concrete Cutting provided contracted services to LendLease during the St Helena Ballina tunnel upgrade project.
Arrow Concrete Cutting knowledge, expertise and latest technology equipment were employed in this major roadworks project.
- Core hole drilling
- Pavement cutting
- Bridge cutting
PACIFIC HIGHWAY NEWSROOM
ST HELENA TUNNEL
Acting prime minister Warren Truss:
‘The staged opening of the 17 kilometre Tintenbar to Ewingsdale upgrade is a remarkable achievement for north coast residents and the thousands of motorists who travel along the Pacific Highway upgrade every year.’